نتيجة البحث: ...
المختصر | الشرح الكامل |
---|---|
MBB | Turbine casing and rotor |
MBD | Bearing |
MBJ | Start-up unit |
MBS | Storage system |
MBW | Sealing oil supply system |
230 | Flare and Burn pit system |
4701 | GT 11 |
4702 | GT 12 |
4703 | GT 13 |
4704 | GT 14 |
420 | Fuel Gas System |
430 | Fuel Oil System |
460 | Compressed Air System |
480 | Black Start Emergency System |
500 | Sea Water System |
EKT | Heating medium system |
MBL | Intake air, cold gas system |
BTL | Battery chargers 125 V or 220 V DC |
BTM | Battery chargers 125 V or 220 V DC |
MKA | Generator, complete, incl. stator, rotor and all integral cooling equipment |
BTA | Batteries 125 V or 220 V DC |
BTB | Batteries 125 V or 220 V DC |
SAM | Heating, ventilation, air-conditioning (HVAC) systems in structures |
MBV | Lubricant supply system |
MKP | Secondary cooling water system |
SAK | Heating, ventilation, air-conditioning (HVAC) systems for general service structures |
BJA | Low voltage subdistribution boards and transformers, normal system |
BHR | Low voltage auxiliary distribution boards, general-purpose |
SGA | Fire water system, conventional area |
MBA | Turbine, compressor rotor with common casing |
CYQ | General gas alarm system (if not assigned to a specific system) |
MBP | Fuel supply system (gaseous) |
MBR | Exhaust gas system (open cycle) |
MBH | Cooling and sealing gas system |
MBX | Non-electric control and protection equipment, incl. fluid supply system |
MBQ | Ignition fuel supply system (if separate) |
CYE | Fire alarm system |
EGU | Custody transfer metering station |
EGB | Tank farm |
SAA | Refrigeration plant (if not part of QIC) |
BAA | Generator leads |
GMA | Central process drainage system |
BAC | Generator circuit breaker, also commutating pole circuit breaker, incl. cooling system |
CHA | Cabinets for generator and transformer protection |
BAT | Generator transformers, including cooling system |
BRU | Converter (static), inverter |
XKA | Black Start Generator Sets |
AXB | Battery plant |
MBM | Combustion chamber (gas heating, combustion) |
GRB | Filtering, mechanical cleaning system |
QFA | Central control air generation system |
SGC | Spray deluge systems, conventional area |
GCK | Piping system, temporary storage system, pump system for main fluid |
EKR | Residues removal system |
ERC | Gas supply system |
QFB | Central control air distribution system |
MBN | Fuel supply system (liquid) |
MBU | Additive system |
GQA | Central domestic waste water collection and drainage systems |
QUH | Sampling systems for main group |
SGY | Control and protection equipment |
BBT | Medium voltage auxiliary power transformers |
BFT | Low voltage auxiliary power transformer |
GCB | Filtering/mechanical cleaning system |
SGE | Sprinkler systems |
MKD | Bearings |
SAD | Heating, ventilation, air-conditioning (HVAC) systems in structures for electro modules |
GKB | Storage, forwarding, distribution system |
GKN | Drinking water supply in structures for process energy supply systems |
CUA | Static excitation system or generator voltage regulator |
BPA | Power installations for large variable-speed drives |
EKC | Heating system |
UBB | GT, ST, GT/ST electrical building/module |
EKB | Preliminary cleaning (moisture and dust separation) |
GAD | Storage system |
UPS | Flushing water system |
GCN | Chemicals supply system |
SGF | Foam fire-fighting systems |
ARA | Protection equipment |
GCR | Flushing water and residues removal system incl. neutralization |
GHC | Distribution systems after treatment (demineralization) |
ELL | Chemical treatment of gaseous fuels incl. residues removal |
AEA | 110 - 219 kV systems |
BUA | Direct current distribution boards 125 V or 220 V |
BUB | Direct current distribution boards 125 V or 220 V |
BRC | Low voltage emergency distribution boards |
BUC | Direct current distribution boards |
MKY | Control and protection equipment |
MBY | Electrical control and protection equipment |
EGA | Receiving equipment incl. pipeline |
EGC | Pump system |
AXC | Uninterruptible power supply system |
AXF | Central equipment |
ANG | Low voltage switchgear < 500 V, Three-phase/single phase alternating current |
AXA | Battery chargers |
ATA | Transformer equipment |
CKA | Online supervisory and diagnostic computer |
USX | Special structure |
SGJ | CO2 fire-fighting systems |
ANK | Direct voltage switchgear 220/110 V |
MBK | Transmission gear between prime mover and driven machine, incl. turning gear, barring gear |
EKU | Custody transfer metering station |
EKY | Control and protection equipment |
CXQ | Local control stations |
GAF | Pump system |
CNT | Instrumentation and control equipment (network cubicles) |
HAM | Triflux system |
STA | Workshop equipment |
ANF | Low voltage switchgear < 500 V, Three-phase/single phase alternating current |
AXD | Low voltage distribution |
AQA | Measuring and metering equipment |
GAC | Piping and channel system |
CRC | Instrumentation and control equipment |
CQA | Instrumentation and control equipment |
BJH | Low voltage subdistribution boards, normal system |
ASV | Group, intermediate and general terminal blocks |
AVA | Marshalling racks |
AVB | Marshalling racks |
ARC | Protection equipment |
ASP | Recording |
MKB | Generator exciter set, including set with electrical braking system |
GCF | Ion exchange, reverse osmosis system (e.g. for demineralization) |